Masterinox News

News on plants and equipment for the pharmaceutical, cosmetic and food industry

Plant extension and increase in production capacity

Plant extension and increase in production capacity

Masterinox is pleased to announce that in July the expansion works of the production unit and the construction of a new office building were started.

The project, resulting from the need to double the area of the production department, will allow Masterinox to take a step forward, thus significantly increasing its production capacity and the engineering department.

The new production area will be built alongside the existing one, becoming perfectly integrated with the current production, including equipment with weights up to 60 tons, 13 meters high and 30 meters long. The engineering department will in turn be implemented with new workplaces and new technicians.

The whole expansion process will take about a year, although we expect the extension of the production capacity to be operational as early as the end of this year.

Our investment policy is aimed at making Masterinox increasingly competitive at an international level, widening the production range and the machinery, as well as increasing our workforce by new hirings of highly qualified staff.

Masterinox Realizzazione nuovi uffici
Masterinox Realizzazione nuovi uffici

Would you like to know more? Please contact us